Controlled early deployment · 20–60 kW

Validate a 20–60 kW UPS configuration with direct access to the NORVION engineering team

A controlled early deployment for non-safety-class applications, based on an agreed FAT/SAT, monitoring and documentation plan before serial release.

Check pilot eligibility · 2 minutes ↗

01 / Programme

A defined engineering collaboration—not a finished-series claim

Suitable for

  • →EPC contractors and integrators
  • →Industrial enterprises
  • →SCADA and energy projects
  • →Edge infrastructure
  • →Service and engineering partners

Participant receives

  • →Dedicated pilot configuration
  • →Direct engineering-team involvement
  • →Joint FAT / SAT programme
  • →Priority technical support
  • →Influence on final specification
  • →Priority terms for future supply

Pilot limits

  • →20–60 kW project range
  • →No special safety-class requirements
  • →Agreed validation programme
  • →Technical monitoring must be possible
  • →Documented test outcomes

02 / Process

From project screening to documented results

  1. 01

    Project screening

    Review the load, topology, environment, programme and safety constraints.

  2. 02

    Target configuration

    Agree a preliminary system, battery, bypass and monitoring approach.

  3. 03

    FAT / SAT programme

    Define acceptance steps, responsibilities and evidence before deployment.

  4. 04

    Pilot monitoring

    Record operation and engineering observations against the agreed programme.

03 / Application

Check whether your project fits the pilot

Start with six short answers. Technical details and a single-line diagram can be added on the second step.

Step 1 of 2
Project fit

Six short answers are enough for an initial fit check.

Submit specificationDiscuss pilot