Controlled early deployment · 20–60 kW
Validate a 20–60 kW UPS configuration with direct access to the NORVION engineering team
A controlled early deployment for non-safety-class applications, based on an agreed FAT/SAT, monitoring and documentation plan before serial release.
Check pilot eligibility · 2 minutes ↗01 / Programme
A defined engineering collaboration—not a finished-series claim
Suitable for
- →EPC contractors and integrators
- →Industrial enterprises
- →SCADA and energy projects
- →Edge infrastructure
- →Service and engineering partners
Participant receives
- →Dedicated pilot configuration
- →Direct engineering-team involvement
- →Joint FAT / SAT programme
- →Priority technical support
- →Influence on final specification
- →Priority terms for future supply
Pilot limits
- →20–60 kW project range
- →No special safety-class requirements
- →Agreed validation programme
- →Technical monitoring must be possible
- →Documented test outcomes
02 / Process
From project screening to documented results
- 01
Project screening
Review the load, topology, environment, programme and safety constraints.
- 02
Target configuration
Agree a preliminary system, battery, bypass and monitoring approach.
- 03
FAT / SAT programme
Define acceptance steps, responsibilities and evidence before deployment.
- 04
Pilot monitoring
Record operation and engineering observations against the agreed programme.
03 / Application
Check whether your project fits the pilot
Start with six short answers. Technical details and a single-line diagram can be added on the second step.